The long climb is almost over as the crew of ENIN-3 prepares to enter the tunnels at Gallitzin, PA |
Date:
10/3/1981 |
Location:
Gallitzin, PA Map  |
Views:
1615 |
Collection Of:

John C Durant |
Locomotives: |
Author: John C Durant
|
 |
Picture Categories: |
This picture is part of album: Early Conrail II |