OIPI-7 exits the tunnel at Gallitzin behind mixed EMD and GE power. Work was still going on the rebuild on the double track tunnel. |
Date:
4/18/1995 |
Location:
Gallitzin, PA Map ![Show Gallitzin on a rail map](/images/map_us.gif) |
Views:
1099 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
John C Durant |
Locomotives: |
Author: John C Durant
|
![CR 5578](http://s3.amazonaws.com/rrpa_photos/1014/CR%205578.jpg) |
Picture Categories: |
This picture is part of album: Conrail 1 |