The CNW power leads the PRGBA down the main and the GBBUA waits behind FRVR power at CF Siding. |
Date:
2/16/1992 |
Location:
Oshkosh, WI Map ![Show Oshkosh on a rail map](/images/map_us.gif) |
Views:
917 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Stephen Borleske |
Locomotives: |
Author: Stephen Borleske
|
![CNW 6823](http://s3.amazonaws.com/rrpa_photos/90899/CNW%206923-2.16.92A.jpg) |
Picture Categories: Winter,Action |
This picture is part of album: February 1992 |