The Dan Patch Bridge (Savage Swing Bridge) is getting worked on in preparation for TC&Ws return across the Minnesota River in the spring. Very rare to see the bridge in the position to let trains through, and this is my first time seeing this. |
Date:
1/31/2016 |
Location:
Bloomington, MN Map  |
Views:
94 |
Collection Of:

Eric Ecklund |
|
Author: Eric Ecklund
|
 |
Picture Categories: |
This picture is part of album: Dan Patch Corridor |