Track work is underway on the south side of the Dan Patch swing bridge in preparation for the return of grain trains later this spring. |
Date:
3/8/2016 |
Location:
Savage, MN Map |
Views:
67 |
Collection Of:
Tony Held |
|
Author: Tony Held
|
|
Picture Categories: Track |
This picture is part of album: Around The Twin Cities: Vol. 2 |