After copying the track warrant, the engineer lines the switch for their move.  Contributor's Pick!       
The conductor has lined the switches behind them, clearing the CSX.
Date: 10/1/2016 Location: Akron, OH   Map Show Akron on a rail map Views: 140 Collection Of:   Fred Stuckmann
Author:  Fred Stuckmann
After copying the track warrant, the engineer lines the switch for their move.
Picture Categories: Action This picture is part of album:  Tracking the empties.
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4558504