The control point at Reid is about to get a facelift. The new unilateral switch is on site and the new signals have been installed but are not yet active. This view shows the typical Southern Railway interlocking plant built with an equilateral #20 turnout. |
Date:
11/19/2006 |
Location:
Salisbury, NC Map |
Views:
303 |
Collection Of:
Marcus Neubacher |
|
Author: Marcus Neubacher
|
|
Picture Categories: |
This picture is part of album: KNTower's NS Piedmont Division |