The 3rd and final pile for this location is moved into position. Steel plates will follow, and will also be vibrated into the ground between the piles to create a temporary wall, allowing trains to use Track 1 (extreme foreground) during future excavation of the soils behind the abutment. |
Date:
9/6/2007 |
Location:
Plainfield, NJ Map  |
Views:
183 |
Collection Of:

Dave Abeles |
|
Author: David Abeles
|
 |
Picture Categories: |
This picture is part of album: So, you want to replace a railroad bridge... |