Though the work began at 7 a.m., it is already 3 p.m. as the 100-ton crane finally lifts G1 into the clear. It too will be shipped to a steel fabricator for refurbishing. |
Date:
9/14/2007 |
Location:
Plainfield, NJ Map  |
Views:
320 |
Collection Of:

Dave Abeles |
|
Author: David Abeles
|
 |
Picture Categories: |
This picture is part of album: So, you want to replace a railroad bridge... |